FRIARS RD over SAN DIEGO CON CO UC
0.7MI E/O RTE 163 · County 073, California · Built 1968 · 7 Lanes · 32,204 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 8 | Very Good |
Location
32.774725, -117.153836
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 58 years old.
Nearby Bridges
FRIARS RD over MISSION CENTER RD
Built 1968
FRIARS ROAD over MURRAY CANYON
Built 1970
MISSION CENTER RD over SAN DIEGO RIVER
Built 1990
FRIARS ROAD over RTE 163 & RAMPS
Built 1970
CAMINO DEL ESTE over SAN DIEGO RIVER
Built 1990
MISSION CENTER RD over INTERSTATE 8
Built 1978
E8-MISSION CENTER over E8-N163 & N163-E8 RAMPS
Built 1978
STATE ROUTE 163 over SAN DIEGO RI W8-N163 CAM
Built 1989
FRIARS RD over QUALCOMM WAY
Built 1968
STATE ROUTE 163 over SAN DIEGO RIVER
Built 1946
Bridge Details
- Structure #
- 57C0292
- Year Built
- 1968
- Reconstructed
- 2002
- Length
- 23.5 m (77.1 ft)
- Max Span
- 9.1 m
- Width
- 35 m (114.8 ft)
- Lanes
- 7
- Daily Traffic
- 32,204
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.