CUYAMACA ST. over SAN DIEGO RIVER

0.5M N/O MISSION GORGE RD · County 073, California · Built 1974 · 4 Lanes · 26,648 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
57C0327
Year Built
1974
Length
152.4 m (500 ft)
Max Span
12.5 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
26,648
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.