OLIVE LANE over FORESTER CREEK
40FT N/O PROSPECT AVE · County 073, California · Built 2008 · 5 Lanes · 1,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
32.833678, -116.989167
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 18 years old.
Nearby Bridges
STATE ROUTE 52 over OLIVE LANE
Built 2011
PROSPECT AVE over FORESTER CREEK
Built 1970
W52 ON-RAMP over CUYAMACA STREET
Built 2011
STATE ROUTE 52 over CUYAMACA STREET
Built 2011
STATE ROUTE 52 over FORESTER CREEK
Built 2011
CUYAMACA ST over FORESTER CREEK
Built 1965
MISSION GORGE RD over FORESTER CREEK
Built 1959
MARSHALL AVE over FORESTER CREEK
Built 2000
PROSPECT AVE over FANITA CREEK
Built 1978
N125-E52 CONNECTOR over FANITA DRIVE
Built 2011
Bridge Details
- Structure #
- 57C0809
- Year Built
- 2008
- Length
- 63.4 m (208 ft)
- Max Span
- 17.7 m
- Width
- 26.1 m (85.6 ft)
- Lanes
- 5
- Daily Traffic
- 1,400
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.