MISSION GORGE RD over FORESTER CREEK
0.7MI W/O CUYAMACA ST · County 073, California · Built 1959 · 6 Lanes · 10,997 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
32.838675, -116.995914
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 67 years old.
Nearby Bridges
STATE ROUTE 52 over FORESTER CREEK
Built 2011
STATE ROUTE 52 over FANITA DRIVE
Built 2011
CARLTON HILL BLVD over SAN DIEGO RIVER
Built 1978
N125-E52 CONNECTOR over FANITA DRIVE
Built 2011
PROSPECT AVE over FANITA CREEK
Built 1978
STATE ROUTE 52 over FANITA CREEK
Built 2011
W52-S125 CONNECTOR over STATE ROUTE 125
Built 2011
STATE ROUTE 52 WB over STATE ROUTE 125
Built 2011
STATE ROUTE 52 EB over STATE ROUTE 125
Built 2011
STATE ROUTE 52 over OLIVE LANE
Built 2011
Bridge Details
- Structure #
- 57C0166
- Year Built
- 1959
- Reconstructed
- 2008
- Length
- 60 m (196.9 ft)
- Max Span
- 12 m
- Width
- 31.2 m (102.4 ft)
- Lanes
- 6
- Daily Traffic
- 10,997
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.