CARLTON HILL BLVD over SAN DIEGO RIVER

0.2MI N/O MISSION GORGE · County 073, California · Built 1978 · 5 Lanes · 23,227 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
57C0523
Year Built
1978
Length
152.4 m (500 ft)
Max Span
12.5 m
Width
23.2 m (76.1 ft)
Lanes
5
Daily Traffic
23,227
Material
Concrete Continuous
Design
Slab
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.