STATE ROUTE 52 WB over MISSION GORGE ROAD

11-SD-052-14.93 · County 073, California · Built 2011 · 2 Lanes · 41,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
57 1095L
Year Built
2011
Length
74.5 m (244.4 ft)
Max Span
42 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
41,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.