STATE ROUTE 52 WB over STATE ROUTE 125
11-SD-052-15.06 · County 073, California · Built 2011 · 2 Lanes · 42,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.836767, -117.003742
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 15 years old.
Nearby Bridges
W52-S125 CONNECTOR over STATE ROUTE 125
Built 2011
STATE ROUTE 52 EB over STATE ROUTE 125
Built 2011
STATE ROUTE 52 over FANITA CREEK
Built 2011
STATE ROUTE 52 WB over MISSION GORGE ROAD
Built 2011
STATE ROUTE 52 EB over MISSION GORGE ROAD
Built 2011
N125-W52 CONNECTOR over SR 125 MISSION GORGE RD
Built 1998
E52-S125 CONNECTOR over MISSION GORGE RD
Built 1998
STATE ROUTE 52 over FANITA DRIVE
Built 2011
N125-E52 CONNECTOR over FANITA DRIVE
Built 2011
E52-S125 CONNECTOR over PROSPECT AVENUE
Built 1998
Bridge Details
- Structure #
- 57 1096L
- Year Built
- 2011
- Length
- 81.5 m (267.4 ft)
- Max Span
- 44.5 m
- Width
- 13 m (42.7 ft)
- Lanes
- 2
- Daily Traffic
- 42,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.