W52 ON-RAMP over CUYAMACA STREET
11-SD-052-16.28 · County 073, California · Built 2011 · 2 Lanes · 9,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.833211, -116.983733
This bridge is in worse condition than 65.2% of bridges in County 073. The average bridge in California is 0 years old; this one is 15 years old.
Nearby Bridges
STATE ROUTE 52 over CUYAMACA STREET
Built 2011
PROSPECT AVE over FORESTER CREEK
Built 1970
CUYAMACA ST over FORESTER CREEK
Built 1965
OLIVE LANE over FORESTER CREEK
Built 2008
STATE ROUTE 52 over OLIVE LANE
Built 2011
MARSHALL AVE over FORESTER CREEK
Built 2000
STATE ROUTE 52 over COTTONWOOD AVENUE
Built 2011
STATE ROUTE 52 over FORESTER CREEK
Built 2011
MISSION GORGE RD over FORESTER CREEK
Built 1959
CUYAMACA ST. over SAN DIEGO RIVER
Built 1974
Bridge Details
- Structure #
- 57 1103K
- Year Built
- 2011
- Length
- 44.8 m (147 ft)
- Max Span
- 44.8 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 9,000
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.