INTERSTATE 215 over SECOND STREET

08-SBD-215-6.79-SBD · County 071, California · Built 2013 · 11 Lanes · 162,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1259
Year Built
2013
Length
46.4 m (152.2 ft)
Max Span
46.4 m
Width
57.6 m (189 ft)
Lanes
11
Daily Traffic
162,000
Material
Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.