5TH ST-S215 ONRAMP over S215 TO 3RD ST OFF RAMP

08-SBD-215-7.01-SBD · County 071, California · Built 2013 · 2 Lanes · 162,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1252K
Year Built
2013
Length
276 m (905.5 ft)
Max Span
32 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
162,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.