N215/5TH ST OFF RA over THIRD ST TO N215 ON RAMP

08-SBD-215-6.98-SBD · County 071, California · Built 2013 · 2 Lanes · 4,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1251S
Year Built
2013
Length
205 m (672.6 ft)
Max Span
38 m
Width
11.7 m (38.4 ft)
Lanes
2
Daily Traffic
4,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.