N215-2ND ST OFF R over BNSF RY & METROLINK

08-SBD-215-6.60-SBD · County 071, California · Built 2013 · 2 Lanes · 1,001 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
54 1254S
Year Built
2013
Length
33.4 m (109.6 ft)
Max Span
12.8 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
1,001
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.