SR 66 (5TH STREET) over I-215 BNSF RY

08-SBD-066-22.99-SBD · County 071, California · Built 2009 · 6 Lanes · 17,800 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
54 1250
Year Built
2009
Length
153 m (502 ft)
Max Span
40 m
Width
39 m (128 ft)
Lanes
6
Daily Traffic
17,800
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.