WHITTIER BLVD over RIO HONDO

0.1MI E/O BLUFF RD · County 037, California · Built 1921 · 4 Lanes · 24,813 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53C2045
Year Built
1921
Reconstructed
1927
Length
146.2 m (479.7 ft)
Max Span
30.5 m
Width
21.6 m (70.9 ft)
Lanes
4
Daily Traffic
24,813
Material
Steel
Design
Truss - Deck
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.