BEVERLY BLVD over UPRR

0.1MI W/O I-605 FWY · County 037, California · Built 1964 · 5 Lanes · 5,034 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
53C0036
Year Built
1964
Length
41.5 m (136.2 ft)
Max Span
12.8 m
Width
29.2 m (95.8 ft)
Lanes
5
Daily Traffic
5,034
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.