INTERSTATE 605 over ROSE HILLS CHANNEL

07-LA-605-R15.37-IDY · County 037, California · Built 1964 · 10 Lanes · 233,000 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
53 1830
Year Built
1964
Length
10.8 m (35.4 ft)
Max Span
2.7 m
Width
43.8 m (143.7 ft)
Lanes
10
Daily Traffic
233,000
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.