OBREGON STREET over INTERSTATE 605

07-LA-605-R13.98 · County 037, California · Built 1964 · 2 Lanes · 900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 1529
Year Built
1964
Length
68.1 m (223.4 ft)
Max Span
22.4 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
900
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.