WHITTIER BLVD over SAN GABRIEL RIV

07-LA-072-6.86-PRV · County 037, California · Built 1968 · 4 Lanes · 34,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C2302
Year Built
1968
Length
114.9 m (377 ft)
Max Span
22.9 m
Width
29.3 m (96.1 ft)
Lanes
4
Daily Traffic
34,000
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.