WASHINGTON BLVD over RIO HONDO

0.4MI W/O PARAMOUNT BLVD · County 037, California · Built 1941 · 6 Lanes · 33,974 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53C0471
Year Built
1941
Reconstructed
1966
Length
147.5 m (483.9 ft)
Max Span
33.5 m
Width
29 m (95.1 ft)
Lanes
6
Daily Traffic
33,974
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,277,000
Total Project Cost
$28,712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.