WASHINGTON BLVD over SAN GABRIEL RIV

0.2MI W/O I-605 FWY · County 037, California · Built 1953 · 4 Lanes · 42,693 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
53C0082
Year Built
1953
Length
102.4 m (336 ft)
Max Span
22.6 m
Width
18.2 m (59.7 ft)
Lanes
4
Daily Traffic
42,693
Material
Concrete Continuous
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.