INTERSTATE 605 over SLAUSON AVE

07-LA-605-R11.54-SFSP · County 037, California · Built 1965 · 11 Lanes · 264,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
53 1665
Year Built
1965
Length
60.7 m (199.1 ft)
Max Span
32.6 m
Width
50.4 m (165.4 ft)
Lanes
11
Daily Traffic
264,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.