SB INTERSTATE 5 over BURIED BOX CULVERT
07-LA-005-3.98-NWK · County 037, California · Built 2015 · 3 Lanes · 87,500 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
33.907628, -118.067861
This bridge is in worse condition than 14.8% of bridges in County 037. The average bridge in California is 0 years old; this one is 11 years old.
Nearby Bridges
FIRESTONE BLVD over SILVERBOW STORM DRN
Built 1934
INTERSTATE 5 over BLOOMFIELD AVENUE
Built 2016
I-5 SB OFFRAMP over BLOOMFIELD AVENUE
Built 2015
ROUTE 5 over SAN ANTONIO DR
Built 2020
INTERSTATE 5 over ROSECRANS AVENUE
Built 2016
FIRESTONE BLVD S over DRAINAGE CHAN
Built 1980
IMPERIAL HWY over BOMBARDIER AVE DRN
Built 1954
SHOEMAKER AVE over I 5 FIRESTONE BLVD
Built 2014
S/B OFF-RAMP over PIONEER BLVD
Built 2020
ROUTE 5 over PIONEER BLVD
Built 2020
Bridge Details
- Structure #
- 53 3075M
- Year Built
- 2015
- Length
- 7.9 m (25.9 ft)
- Max Span
- 7 m
- Lanes
- 3
- Daily Traffic
- 87,500
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.