FIRESTONE BLVD S over DRAINAGE CHAN
0.1MI E/O BLOOMFIELD AVE · County 037, California · Built 1980 · 2 Lanes · 3,555 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.900425, -118.061383
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 46 years old.
Nearby Bridges
INTERSTATE 5 over ROSECRANS AVENUE
Built 2016
I-5 SB OFFRAMP over BLOOMFIELD AVENUE
Built 2015
INTERSTATE 5 over BLOOMFIELD AVENUE
Built 2016
SHOEMAKER AVE over I 5 FIRESTONE BLVD
Built 2014
FIRESTONE BLVD over SILVERBOW STORM DRN
Built 1934
SB INTERSTATE 5 over BURIED BOX CULVERT
Built 2015
NB 5 ONRAMP over GRADED EARTH
Built 2016
SB 5 OFFRAMP over GRADED EARTH
Built 2016
NB 5 OFFRAMP over GRADED EARTH
Built 2016
CARMENITA ROAD over INTERSTATE 5
Built 2016
Bridge Details
- Structure #
- 53C1698
- Year Built
- 1980
- Length
- 13.1 m (43 ft)
- Max Span
- 1.8 m
- Width
- 16.8 m (55.1 ft)
- Lanes
- 2
- Daily Traffic
- 3,555
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.