NB 5 ONRAMP over GRADED EARTH
07-LA-005-R2.48-NRW · County 037, California · Built 2016 · 2 Lanes · 3,670 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.894617, -118.047306
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 10 years old.
Nearby Bridges
SB 5 OFFRAMP over GRADED EARTH
Built 2016
NB 5 OFFRAMP over GRADED EARTH
Built 2016
SB 5 ONRAMP over GRADED EARTH
Built 2016
CARMENITA ROAD over INTERSTATE 5
Built 2016
SHOEMAKER AVE over I 5 FIRESTONE BLVD
Built 2014
ROSECRANS AVE over COYOTE CR NF
Built 1960
ALONDRA BLVD over INTERSTATE 5
Built 2015
FIRESTONE BLVD S over DRAINAGE CHAN
Built 1980
Alondra Blvd over North Fork Coyote Ck
Built 2014
INTERSTATE 5 over ROSECRANS AVENUE
Built 2016
Bridge Details
- Structure #
- 53 3018S
- Year Built
- 2016
- Length
- 78.9 m (258.9 ft)
- Max Span
- 31 m
- Width
- 11.7 m (38.4 ft)
- Lanes
- 2
- Daily Traffic
- 3,670
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.