SHOEMAKER AVE over I 5 FIRESTONE BLVD
07-LA-005-3.04-NRW · County 037, California · Built 2014 · 2 Lanes · 10,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
33.898222, -118.055722
This bridge is in worse condition than 64.9% of bridges in County 037. The average bridge in California is 0 years old; this one is 12 years old.
Nearby Bridges
FIRESTONE BLVD S over DRAINAGE CHAN
Built 1980
INTERSTATE 5 over ROSECRANS AVENUE
Built 2016
NB 5 ONRAMP over GRADED EARTH
Built 2016
SB 5 OFFRAMP over GRADED EARTH
Built 2016
I-5 SB OFFRAMP over BLOOMFIELD AVENUE
Built 2015
NB 5 OFFRAMP over GRADED EARTH
Built 2016
INTERSTATE 5 over BLOOMFIELD AVENUE
Built 2016
CARMENITA ROAD over INTERSTATE 5
Built 2016
SB 5 ONRAMP over GRADED EARTH
Built 2016
ROSECRANS AVE over COYOTE CR NF
Built 1960
Bridge Details
- Structure #
- 53 3039
- Year Built
- 2014
- Length
- 143.3 m (470.1 ft)
- Max Span
- 42.8 m
- Width
- 14 m (45.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,000
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.