S/B OFF-RAMP over PIONEER BLVD

07-LA-005-5.12 · County 037, California · Built 2020 · 1 Lanes · 12,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
53 3071K
Year Built
2020
Length
65.5 m (214.9 ft)
Max Span
35.6 m
Width
8.9 m (29.2 ft)
Lanes
1
Daily Traffic
12,000
Material
Concrete
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.