ROUTE 5 over PIONEER BLVD
07-LA-005-5.12-NRW · County 037, California · Built 2020 · 11 Lanes · 194,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.920167, -118.081667
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 6 years old.
Nearby Bridges
S/B OFF-RAMP over PIONEER BLVD
Built 2020
IMPERIAL HWY over BOMBARDIER AVE DRN
Built 1954
FIRESTONE BLVD over LONGVEST DRN
Built 1954
ROUTE 5 over SAN ANTONIO DR
Built 2020
FIRESTONE BLVD over SPTCO
Built 1954
SB INTERSTATE 5 over BURIED BOX CULVERT
Built 2015
FIRESTONE BLVD over SILVERBOW STORM DRN
Built 1934
FLORENCE-N5 ON RMP over N5-N&S605 CONNECTOR RAMP
Built 1965
FLORENCE AVE over INTERSTATE 5
Built 2020
S605-W105 CONN over IMPERIAL HIGHWAY
Built 1993
Bridge Details
- Structure #
- 53 3062
- Year Built
- 2020
- Length
- 60.6 m (198.8 ft)
- Max Span
- 30.3 m
- Width
- 67 m (219.8 ft)
- Lanes
- 11
- Daily Traffic
- 194,000
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.