FLORENCE AVE over INTERSTATE 5

07-LA-005-6.38-DNY · County 037, California · Built 2020 · 8 Lanes · 189,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
53 3065
Year Built
2020
Length
140.7 m (461.6 ft)
Max Span
49.7 m
Width
39.6 m (129.9 ft)
Lanes
8
Daily Traffic
189,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.