INTERSTATE 605 over CECILIA STREET
07-LA-605-R8.91-NRW · County 037, California · Built 1966 · 13 Lanes · 276,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.932014, -118.101572
This bridge is in worse condition than 73.1% of bridges in County 037. The average bridge in California is 0 years old; this one is 60 years old.
Nearby Bridges
N605-S5 CONNECTOR over FLORENCE AVE
Built 1965
INTERSTATE 605 over FLORENCE AVE
Built 1965
FLORENCE AVE over SAN GABRIEL RIV
Built 1951
FLORENCE AVE over INTERSTATE 5
Built 2020
INTERSTATE 605 over FIRESTONE BLVD
Built 1966
N605-FIRESTONE RMP over FIRESTONE BLVD
Built 1993
FLORENCE-N5 ON RMP over N5-N&S605 CONNECTOR RAMP
Built 1965
INTERSTATE 605 over UP RR DOWNEY-NORWALK RD
Built 1966
N605-FIRESTONE RMP over UP RR DOWNEY-NORWALK RD
Built 1990
FIRESTONE-S605 RMP over UP RR DOWNEY-NORWALK RD
Built 1993
Bridge Details
- Structure #
- 53 1654
- Year Built
- 1966
- Reconstructed
- 1985
- Length
- 38.1 m (125 ft)
- Max Span
- 20.4 m
- Width
- 58.4 m (191.6 ft)
- Lanes
- 13
- Daily Traffic
- 276,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.