N605-FIRESTONE RMP over FIRESTONE BLVD
07-LA-605-R8.37-NRW · County 037, California · Built 1993 · 2 Lanes · 254,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.924575, -118.104017
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 33 years old.
Nearby Bridges
INTERSTATE 605 over FIRESTONE BLVD
Built 1966
INTERSTATE 605 over UP RR DOWNEY-NORWALK RD
Built 1966
N605-FIRESTONE RMP over UP RR DOWNEY-NORWALK RD
Built 1990
FIRESTONE-S605 RMP over UP RR DOWNEY-NORWALK RD
Built 1993
S605-W105 CONN over IMPERIAL HIGHWAY
Built 1993
N605-FIRESTONE BLD over IMPERIAL HWY ON-RAMP
Built 1993
IMPERIAL-S605 RMP over IMPERIAL HIGHWAY
Built 1993
INTERSTATE 605 over IMPERIAL HIGHWAY
Built 1966
E105-N605 CONN over RMP CONN 105 605 IMP
Built 1993
INTERSTATE 605 over CECILIA STREET
Built 1966
Bridge Details
- Structure #
- 53 1653S
- Year Built
- 1993
- Length
- 71.5 m (234.6 ft)
- Max Span
- 40.4 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 254,500
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.