FIRESTONE-S605 RMP over UP RR DOWNEY-NORWALK RD
07-LA-605-R8.23-NRW · County 037, California · Built 1993 · 2 Lanes · 2,600 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.922983, -118.103917
This bridge is in worse condition than 15.3% of bridges in County 037. The average bridge in California is 0 years old; this one is 33 years old.
Nearby Bridges
N605-FIRESTONE RMP over UP RR DOWNEY-NORWALK RD
Built 1990
INTERSTATE 605 over UP RR DOWNEY-NORWALK RD
Built 1966
N605-FIRESTONE RMP over FIRESTONE BLVD
Built 1993
INTERSTATE 605 over FIRESTONE BLVD
Built 1966
S605-W105 CONN over IMPERIAL HIGHWAY
Built 1993
N605-FIRESTONE BLD over IMPERIAL HWY ON-RAMP
Built 1993
IMPERIAL-S605 RMP over IMPERIAL HIGHWAY
Built 1993
E105-N605 CONN over RMP CONN 105 605 IMP
Built 1993
INTERSTATE 605 over IMPERIAL HIGHWAY
Built 1966
FIRESTONE BLVD over SPTCO
Built 1954
Bridge Details
- Structure #
- 53 1652K
- Year Built
- 1993
- Length
- 139 m (456 ft)
- Max Span
- 35.4 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 2,600
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A