99 W FRONTAGE ROAD over BIEGHLE DRAIN
0.1 MI S OF MARIPOSA ROAD · County 077, California · Built 1958 · 2 Lanes · 32,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
37.933256, -121.236083
This bridge is in worse condition than 38.6% of bridges in County 077. The average bridge in California is 0 years old; this one is 68 years old.
Nearby Bridges
MARIPOSA ROAD over SR 99
Built 2016
STATE ROUTE 99 over DUCK CREEK
Built 1956
99 W FRONTAGE ROAD over DUCK CREEK
Built 2016
SR 99 NB OFF RAMP over DUCK CREEK
Built 2016
STATE ROUTE 99 over DUCK CREEK SOUTH BRANCH
Built 2016
MARIPOSA ROAD over DUCK CREEK
Built 2016
STAGECOACH ROAD over DUCK CREEK
Built 1972
SR 4-FARMINGTON RD over STATE ROUTE 99
Built 2021
MUNFORD AVENUE over DUCK CREEK S BRANCH
Built 1964
POCK LANE over DUCK CREEK
Built 1963
Bridge Details
- Structure #
- 29C0491
- Year Built
- 1958
- Reconstructed
- 1968
- Length
- 6.3 m (20.7 ft)
- Max Span
- 1.6 m
- Width
- 16 m (52.5 ft)
- Lanes
- 2
- Daily Traffic
- 32,000
- Material
- Steel
- Design
- Culvert
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.