MARIPOSA ROAD over SR 99
10-SJ-099-16.68-STKN · County 077, California · Built 2016 · 6 Lanes · 9,400 vehicles/day
Overall
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.933822, -121.23445
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 10 years old.
Nearby Bridges
99 W FRONTAGE ROAD over BIEGHLE DRAIN
Built 1958
STATE ROUTE 99 over DUCK CREEK
Built 1956
SR 99 NB OFF RAMP over DUCK CREEK
Built 2016
STATE ROUTE 99 over DUCK CREEK SOUTH BRANCH
Built 2016
99 W FRONTAGE ROAD over DUCK CREEK
Built 2016
MARIPOSA ROAD over DUCK CREEK
Built 2016
STAGECOACH ROAD over DUCK CREEK
Built 1972
MUNFORD AVENUE over DUCK CREEK S BRANCH
Built 1964
SR 4-FARMINGTON RD over STATE ROUTE 99
Built 2021
POCK LANE over DUCK CREEK
Built 1963
Bridge Details
- Structure #
- 29 0325
- Year Built
- 2016
- Length
- 93.7 m (307.4 ft)
- Max Span
- 47.5 m
- Width
- 32 m (105 ft)
- Lanes
- 6
- Daily Traffic
- 9,400
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.