SR 99 NB OFF RAMP over DUCK CREEK
10-SJ-099-16.48-STKN · County 077, California · Built 2016 · 1 Lanes · 5,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
37.931067, -121.232867
This bridge is in worse condition than 8.9% of bridges in County 077. The average bridge in California is 0 years old; this one is 10 years old.
Nearby Bridges
STATE ROUTE 99 over DUCK CREEK SOUTH BRANCH
Built 2016
STATE ROUTE 99 over DUCK CREEK
Built 1956
99 W FRONTAGE ROAD over DUCK CREEK
Built 2016
MARIPOSA ROAD over DUCK CREEK
Built 2016
MARIPOSA ROAD over SR 99
Built 2016
99 W FRONTAGE ROAD over BIEGHLE DRAIN
Built 1958
STAGECOACH ROAD over DUCK CREEK
Built 1972
MUNFORD AVENUE over DUCK CREEK S BRANCH
Built 1964
POCK LANE over DUCK CREEK
Built 1963
MARIPOSA ROAD over DUCK CREEK S BRANCH
Built 1934
Bridge Details
- Structure #
- 29 0335
- Year Built
- 2016
- Length
- 33.2 m (108.9 ft)
- Max Span
- 12.8 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 1
- Daily Traffic
- 5,000
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.