STAGECOACH ROAD over DUCK CREEK
0.1 MI N OF MARIPOSA RD · County 077, California · Built 1972 · 2 Lanes · 11,300 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
37.933128, -121.227664
This bridge is in worse condition than 38.6% of bridges in County 077. The average bridge in California is 0 years old; this one is 54 years old.
Nearby Bridges
MARIPOSA ROAD over DUCK CREEK
Built 2016
MUNFORD AVENUE over DUCK CREEK S BRANCH
Built 1964
SR 99 NB OFF RAMP over DUCK CREEK
Built 2016
STATE ROUTE 99 over DUCK CREEK SOUTH BRANCH
Built 2016
STATE ROUTE 99 over DUCK CREEK
Built 1956
MARIPOSA ROAD over SR 99
Built 2016
99 W FRONTAGE ROAD over DUCK CREEK
Built 2016
MARIPOSA ROAD over DUCK CREEK S BRANCH
Built 1934
99 W FRONTAGE ROAD over BIEGHLE DRAIN
Built 1958
SR 4-FARMINGTON RD over STATE ROUTE 99
Built 2021
Bridge Details
- Structure #
- 29C0334
- Year Built
- 1972
- Length
- 12.5 m (41 ft)
- Max Span
- 4.3 m
- Width
- 19.5 m (64 ft)
- Lanes
- 2
- Daily Traffic
- 11,300
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.