MARIPOSA ROAD over DUCK CREEK
0.25 MI S/E OF SR 99 · County 077, California · Built 2016 · 5 Lanes · 4,642 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 8 | Very Good |
Location
37.932467, -121.230489
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 10 years old.
Nearby Bridges
STAGECOACH ROAD over DUCK CREEK
Built 1972
SR 99 NB OFF RAMP over DUCK CREEK
Built 2016
STATE ROUTE 99 over DUCK CREEK SOUTH BRANCH
Built 2016
STATE ROUTE 99 over DUCK CREEK
Built 1956
99 W FRONTAGE ROAD over DUCK CREEK
Built 2016
MARIPOSA ROAD over SR 99
Built 2016
MUNFORD AVENUE over DUCK CREEK S BRANCH
Built 1964
99 W FRONTAGE ROAD over BIEGHLE DRAIN
Built 1958
MARIPOSA ROAD over DUCK CREEK S BRANCH
Built 1934
SR 4-FARMINGTON RD over STATE ROUTE 99
Built 2021
Bridge Details
- Structure #
- 29C0451
- Year Built
- 2016
- Length
- 20.4 m (66.9 ft)
- Max Span
- 20.4 m
- Width
- 32.2 m (105.6 ft)
- Lanes
- 5
- Daily Traffic
- 4,642
- Material
- Prestressed Concrete
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.