GOLDEN GATE AVE over HWY 99
10-SJ-099-17.41-STKN · County 077, California · Built 2016 · 5 Lanes · 11,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
37.944392, -121.235761
This bridge is in worse condition than 38.6% of bridges in County 077. The average bridge in California is 0 years old; this one is 10 years old.
Nearby Bridges
SR 4-FARMINGTON RD over STATE ROUTE 99
Built 2021
ST RTE 99 & RAMPS over MORMON SLOUGH
Built 1949
ORO AVENUE over MORMON SLOUGH
Built 1988
GOLDEN GATE AVENUE over MORMON SLOUGH
Built 1966
DR MLK JR BLVD over HWY 99
Built 2016
MAIN STREET over STATE ROUTE 99
Built 2016
MARIPOSA ROAD over SR 99
Built 2016
99 W FRONTAGE ROAD over BIEGHLE DRAIN
Built 1958
DR MLK JR BLVD over MORMON SLOUGH
Built 1949
MARIPOSA ROAD over DUCK CREEK
Built 2016
Bridge Details
- Structure #
- 29 0330
- Year Built
- 2016
- Length
- 106.2 m (348.4 ft)
- Max Span
- 37.5 m
- Width
- 26.8 m (87.9 ft)
- Lanes
- 5
- Daily Traffic
- 11,700
- Material
- Prestressed Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.