ORO AVENUE over MORMON SLOUGH
0.3 MI SOUTH MAIN ST · County 077, California · Built 1988 · 2 Lanes · 4,300 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.950289, -121.232708
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 38 years old.
Nearby Bridges
ST RTE 99 & RAMPS over MORMON SLOUGH
Built 1949
DR MLK JR BLVD over HWY 99
Built 2016
GOLDEN GATE AVE over HWY 99
Built 2016
MAIN STREET over STATE ROUTE 99
Built 2016
GOLDEN GATE AVENUE over MORMON SLOUGH
Built 1966
SR 4-FARMINGTON RD over STATE ROUTE 99
Built 2021
WALKER LANE over MORMON SLOUGH
Built 1974
N99-W4 CONNECTOR over SR 99 E4-N99 N99-E26
Built 1993
E4-N99 CONNECTOR over STATE ROUTE 99
Built 1993
DR MLK JR BLVD over MORMON SLOUGH
Built 1949
Bridge Details
- Structure #
- 29C0338
- Year Built
- 1988
- Length
- 20.7 m (67.9 ft)
- Max Span
- 7.9 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 2
- Daily Traffic
- 4,300
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.