INTERSTATE 5 NB over PARADISE CUT UC
10-SJ-005-R13.87 · County 077, California · Built 1971 · 5 Lanes · 80,000 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.779528, -121.315172
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 55 years old.
Nearby Bridges
INTERSTATE 5 SB over PARADISE CUT UC
Built 1971
I-5 NB & SR 120 EB over SAN JOAQUIN RIVER
Built 1971
MANTHEY ROAD over SAN JOAQUIN RIVER
Built 1926
INTERSTATE 5 SB over SAN JOAQUIN RIVER
Built 1972
W120-S5 CONNECTOR over SAN JOAQUIN RIVER 03
Built 1947
E205-N5 CONNECTOR over PARADISE CUT
Built 1970
INTERSTATE 5 SB over PARADISE CUT
Built 1947
INTERSTATE 5 NB over PARADISE CUT
Built 1969
MANTHEY ROAD over PARADISE CUT
Built 1932
INTERSTATE 5 SB over W120-S5 CONN RMP & UP RR
Built 1971
Bridge Details
- Structure #
- 29 0029R
- Year Built
- 1971
- Length
- 86.9 m (285.1 ft)
- Max Span
- 22.9 m
- Width
- 24.4 m (80.1 ft)
- Lanes
- 5
- Daily Traffic
- 80,000
- Material
- Concrete Continuous
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,120,000
- Total Project Cost
- $3,561,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.