MANTHEY ROAD over PARADISE CUT
1.2 MI S/W STEWART RD · County 077, California · Built 1932 · 2 Lanes · 50 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
37.771633, -121.326489
This bridge is in worse condition than 52.5% of bridges in County 077. The average bridge in California is 0 years old; this one is 94 years old.
Nearby Bridges
INTERSTATE 5 NB over PARADISE CUT
Built 1969
INTERSTATE 5 SB over PARADISE CUT
Built 1947
E205-N5 CONNECTOR over PARADISE CUT
Built 1970
E205-N5 CONNECTOR over INTERSTATE 5
Built 1970
INTERSTATE 5 SB over TOM PAINE SLOUGH
Built 1971
INTERSTATE 5 NB over TOM PAINE SLOUGH
Built 1971
INTERSTATE 5 NB over PARADISE CUT UC
Built 1971
INTERSTATE 5 SB over PARADISE CUT UC
Built 1971
INTERSTATE 205 EB over CANAL ROAD
Built 1970
11 ST-OLD RTE 205 over INTERSTATE ROUTE 5
Built 1971
Bridge Details
- Structure #
- 29C0122
- Year Built
- 1932
- Length
- 134.6 m (441.6 ft)
- Max Span
- 13.4 m
- Width
- 10.8 m (35.4 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.