INTERSTATE 5 SB over PARADISE CUT

10-SJ-005-R12.99 · County 077, California · Built 1947 · 5 Lanes · 143,000 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29 0032L
Year Built
1947
Reconstructed
1969
Length
154.5 m (506.9 ft)
Max Span
13.4 m
Width
24.4 m (80.1 ft)
Lanes
5
Daily Traffic
143,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.