INTERSTATE 5 SB over W120-S5 CONN RMP & UP RR

10-SJ-005-R14.80 · County 077, California · Built 1971 · 3 Lanes · 80,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
29 0251L
Year Built
1971
Length
154.2 m (505.9 ft)
Max Span
39.6 m
Width
16.1 m (52.8 ft)
Lanes
3
Daily Traffic
80,000
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.