MANTHEY ROAD over SAN JOAQUIN RIVER
0.2 MI NE OF STEWART RD · County 077, California · Built 1926 · 2 Lanes · 750 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 4 | Poor |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
37.786278, -121.306489
This bridge is in worse condition than 90.4% of bridges in County 077. The average bridge in California is 0 years old; this one is 100 years old.
Nearby Bridges
I-5 NB & SR 120 EB over SAN JOAQUIN RIVER
Built 1971
W120-S5 CONNECTOR over SAN JOAQUIN RIVER 03
Built 1947
INTERSTATE 5 SB over SAN JOAQUIN RIVER
Built 1972
INTERSTATE 5 SB over W120-S5 CONN RMP & UP RR
Built 1971
INTERSTATE 5 NB over W120-S5 CONN RMP & UP RR
Built 1971
W120-N5 CONNECTOR over UP RR
Built 1980
INTERSTATE 5 NB over PARADISE CUT UC
Built 1971
INTERSTATE 5 SB over PARADISE CUT UC
Built 1971
SR 120 EB over GUTHMILLER ROAD
Built 1980
SR 120 WB over GUTHMILLER ROAD
Built 1980
Bridge Details
- Structure #
- 29C0127
- Year Built
- 1926
- Length
- 163.6 m (536.7 ft)
- Max Span
- 61.1 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 750
- Material
- Steel
- Design
- Truss - Thru
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,838,000
- Total Project Cost
- $6,449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.