Dove Valley Ranch over Wash
0.2 mi E Jct 95th Ave · County 013, Arizona · Built 1999 · 3 Lanes · 1,477 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.6713, -112.2609
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 27 years old.
Nearby Bridges
Beardsley Rd over Wash
Built 1994
95th Ave over Wash
Built 1994
Runion Dr over Wash
Built 1996
Adam Ave over Wash
Built 1999
Clara Ln over Wash
Built 1999
W Lake Pleasant Pk over Waterway
Built 2001
Harmony Ln over Drainage Basin
Built 2007
Deanna Dr over Drainage Basin
Built 1996
Quail Ave over Drainage Basin
Built 2007
Salter Dr over Wash
Built 1996
Bridge Details
- Structure #
- 10887
- Year Built
- 1999
- Length
- 18.6 m (61 ft)
- Max Span
- 2.7 m
- Lanes
- 3
- Daily Traffic
- 1,477
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.