Deanna Dr over Drainage Basin
0.25 mi E Jct 91st Ave · County 013, Arizona · Built 1996 · 2 Lanes · 500 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.6761, -112.251
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 30 years old.
Nearby Bridges
W Lake Pleasant Pk over Waterway
Built 2001
Salter Dr over Wash
Built 1996
W Deanna Dr over Drainage Ditch
Built 1997
N 87th Ave over Wash
Built 1990
W Lake Pleasant Pk over Wash
Built 2001
Burnett Rd over Waterway
Built 2002
Clara Ln over Wash
Built 1999
Tonopah Dr over Waterway
Built 2002
Adam Ave over Wash
Built 1999
87th Ave over Waterway
Built 1999
Bridge Details
- Structure #
- 10873
- Year Built
- 1996
- Length
- 17.4 m (57.1 ft)
- Max Span
- 3.4 m
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.