Adam Ave over Wash
0.15 mi E Jct 95th Ave · County 013, Arizona · Built 1999 · 2 Lanes · 500 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
33.6785, -112.261
This bridge is in worse condition than 78.1% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 27 years old.
Nearby Bridges
Dove Valley Ranch over Wash
Built 1999
Melinda Ln over Drainage Basin
Built 2007
Quail Ave over Drainage Basin
Built 2007
Salter Dr over Wash
Built 1996
Deer Valley Rd over Drainage Basin
Built 2006
Deanna Dr over Drainage Basin
Built 1996
Harmony Ln over Drainage Basin
Built 2007
Via Del Sol over Drainage Basin
Built 2015
Runion Dr over Wash
Built 1996
W Lake Pleasant Pk over Waterway
Built 2001
Bridge Details
- Structure #
- 10886
- Year Built
- 1999
- Length
- 10.1 m (33.1 ft)
- Max Span
- 1.8 m
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.