Harmony Ln over Drainage Basin
@ Jct w/ 98th Ave · County 013, Arizona · Built 2007 · 2 Lanes · 500 vehicles/day
Overall
Culvert
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 8 | Very Good |
Location
33.6753, -112.2707
This bridge is in worse condition than 48% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 19 years old.
Nearby Bridges
Quail Ave over Drainage Basin
Built 2007
Lake Pleasant Pkwy over Drainage Basin
Built 2007
Melinda Ln over Drainage Basin
Built 2007
Runion Dr over Wash
Built 1996
Irma Ln over Wash
Built 1996
Deer Valley Rd over Drainage Basin
Built 2006
Mohawk Ln over Wash
Built 1996
Via Del Sol over Drainage Basin
Built 2015
Lake Pleasant Rd over Drainage Basin
Built 2007
Adam Ave over Wash
Built 1999
Bridge Details
- Structure #
- 10962
- Year Built
- 2007
- Length
- 10.7 m (35.1 ft)
- Max Span
- 2.4 m
- Lanes
- 2
- Daily Traffic
- 500
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.