Southern Ave over RWCD Canal

0.7 mi E Jct Higley Rd · County 013, Arizona · Built 1967 · 7 Lanes · 17,422 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
09433
Year Built
1967
Reconstructed
1987
Length
10.7 m (35.1 ft)
Max Span
9.8 m
Width
32.5 m (106.6 ft)
Lanes
7
Daily Traffic
17,422
Material
Prestressed Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.