Sprstn Sprgs Blvd over Storm Drain
0.1 mi N of US 60 · County 013, Arizona · Built 1988 · 5 Lanes · 15,600 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
33.388889, -111.7
This bridge is in worse condition than 52.2% of bridges in County 013. The average bridge in Arizona is 0 years old; this one is 38 years old.
Nearby Bridges
US 60 over RWCD Canal
Built 1984
Superst Sprgs Blvd over US 60
Built 1988
Southern Ave over RWCD Floodway
Built 1987
Southern Ave over RWCD Canal
Built 1967
Baseline Road over RWCD Floodway
Built 1983
Baseline Road over RWCD Canal
Built 1983
Power Road over Storm Drain
Built 1984
Power Road over US 60
Built 1984
Higley Road over US 60
Built 1984
Clearview Avenue over Drainage Channel
Built 1989
Bridge Details
- Structure #
- 06853
- Year Built
- 1988
- Length
- 6.4 m (21 ft)
- Max Span
- 3 m
- Lanes
- 5
- Daily Traffic
- 15,600
- Material
- Concrete Continuous
- Design
- Culvert
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.