US 60 over RWCD Canal

15.4 mi E Jct I-10 · County 013, Arizona · Built 1984 · 12 Lanes · 179,483 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
01923
Year Built
1984
Reconstructed
2007
Length
136.2 m (446.9 ft)
Max Span
19.5 m
Width
60.3 m (197.8 ft)
Lanes
12
Daily Traffic
179,483
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.